Process flow and raw materials of aluminum and
aluminum alloy anodic oxidation tinting
Procedure specification on aluminum and aluminum alloy anodic oxidation tinting
1. Procedure specification(line drawing)
Substrate
→
Mounted hanging
→
Degreasing
→
Alkaline etching
→
Neutralization
→
Anodic oxidation
→
Electrolytic coloring
→
Sealing
→
Electrophoretic coating
→
Curing
→
Unloading packaging
→
Warehousing
2. Mounted hanging
:
2.1 preparations before mounted hanging.
2.1.1 Check the conductive parts like conductive beams and bars. They should be regularly
polished, cleaned or repaired.
2.1.2 Get ready conductivity of aluminum and aluminum wire.
2.1.3 Check the pneumatic tools and related equipment.
2.1.4 Check whether or not requirements like length, count, color, thickness on the flow paper or
production task list are consistent with the order drawing and actual materials.
2.1.5 Depending on the specifications (size of circumscribed circle, external surface area, etc.) to
determine the count and space. To control the pigment spacing about 1.2 times than the horizontal
width of the material shaped, and the white material spacing about 1 time than the width.
2.1.6 Choose the appropriate rack, and ensure that hook number of negative and positive hangers
is the same with the count of materials shaped.
2.2 Mounted hanging:
2.2.1 When hanging, fix the topside one first, and then the bottom one, and then arrange the
remaining sections in the middle, and tighten the screws.
2.2.2 Before hanging, placing one aluminum sheet between the material and aluminum screw p so
that it can prevent poor conductivity impacting oxidation, coloring and electrophoresis.
2.2.3 When hanging, it is not allowed to hang all the materials in the lower or upper rack.
2.2.4 The hanged materials should recline more than 14 degrees in order to facilitate air
exhausting in electrophoresis or coloring, and reduce the air bubbles.
2.2.5 When hanging, considering the facing of the decorative surface and groove to prevent the
color shading, bubbles, pitting appearing in the decorative surface.
2.2.6 Like some flexible and easily deformed materials, put one more rack or aluminum wire in
the middle to prevent friction between the materials or touching tank plate, and that may abrade or
burn the surface.
2.2.7 When selecting vice-bar rack, the plug rod is preferred. When using aluminum banding, they
must be evenly spaced, and the outcrops should be less than 25mm.
2.2.8 Materials with great disparity of cross-section size and shape are prohibited to hang in the
same row.
2.2.9 When hanging and handling equipment, you must wear clean gloves, gently and well
protecting the surface.
2.2.10 When hanging or handling equipment, workers should strengthen self-examination and
cross-examination, the failure materials are non-mounted, and take appropriate measures to deal
with the surface stained with oil or aluminum burrs
2.2.11 After eliminating unqualified ones, you must make them up in time by order.
2.2.12 In hanging area, materials should not be stored for too long time, to prevent corrosion of
the surface.
2.2.13 Filling the hanging record and oxidation process card. Accurately calculating and fill in
oxidation of each linked area, checking models, count and color by orders at any time.
2.2.14 Do a good job in shift procedures and keep the work area clean.
3. Preparation before oxidized production units:
3.1 Checking the level of the liquid in the process tank. According to test report card, to adjust the
concentration of the bath solution and ensure that bath solution is always in line with technical
requirements. Workers should frequently sweep the dirt from the bath solution.
3.2 Checking the vehicle, freezer, rectifiers, circulating acid pump, water pump, transfer cars,
furnace and other equipment, any exception should be immediately solved.
3.3 Check PH (or conductivity) and cleanliness in the pure water washing tank and running water
washing tank. If it does not meet the technical requirements, workers should change it and
hydrating overflow.
3.4 Open the alkaline etching, hot pure water tank, sealing the steam or cooling water tank; open
the oxidation tank, coloring tank and cooling system of electrophoresis tank to ensure the
uniformity of bath solution and temperature complying with requirements.
3.5 Check the Roots blowers, exhaust blowers and exhaust fans. Before the production, they
should be opened.
3.6 Carefully check the oxidation process card, specifically confirm the production requirements,
and prepare the color palette.
4. General requirements for oxidation sets operation:
4.1 It is not allowed to hang t more than two hangings every time. And keeping a certain distance
between the two hangings to prevent collision between the materials.
4.2 When materials hung into and hung out of the bath solution, they must be inclined to 30°.
4.3 Materials falling into the tank must be removed promptly and hung up in rafts, the damage
ones must be promptly notified to group-to-order equipment to make them up.
4.4 In addition to alkaline etching and coloring, the sections should be hung out after the bath
solution drained away to reduce the flow of waste and pollution.
4.5 When the hanging materials must cross other sections, the transferring ones must maintain the
level of the degree to reduce the flow of liquid and pollute materials and conductive beam.
4.6 Each process should be promptly fill in the oxidation process cards, and sign them.
5. Degreasing:
5.1 Process Parameters
Composition of bath solution: acidic degreasing agent 2 to 3%
Temperature: room temperature
Degreasing time: 1 ~ 3min
5.2 Operating requirements:
5.2.1 Check process card, make production requirements clear. Materials with the same color,
same model and same order or similar specification should be suspended into the degreasing tank
simultaneously or preferentially, so that it can facilitate the operation the post-procedure.
5.2.2 When the degreasing is finished, the materials should be hung out of the tank, preventing the
sand from the surface.
5.2.3 After degreasing, the surface should be well-distributed and wet, and the materials should be
washed by Level 2 water then turned into the alkaline etching process.
6. Alkaline etching:
6.1 Process parameters:
Composition of bath solution: plain-surface alkaline etching, sand-surface alkaline etching
NaOH: 40 ~ 50g / l 45 ~ 60g / l
Additives (NaOH): 1 / 12 ~ 1 / 15 1 / 6 1 / 8
Temperature: 40 ~ 45 ℃ 45 ~ 55 ℃
Alkaline etching time: 1 ~ 3min 10 ~ 30min
6.2 Operating requirements:
6.2.1 When alkaline etching, the forced draught blowers and exhaust fans should be opened.
6.2.2 When alkaline etching is finished, materials should be hung out as soon as possible,
finishing shedding immediately and transferring to the tank washing, so that it can prevent
straying marking from the surface.
6.2.3 Strictly control alkaline etching process parameters, to ensure uniform quality of the surface
after alkaline etching.
6.2.4 Post-alkaline-etching materials must be washed by Level 2 overflow. The remaining
alkaline liquid
should be fully cleared away, so that the raffinate can’t pollute other tanks.
7. Neutralization:
7.1 Process parameters:
Composition of bath solution: HNO3: 120 ~ 150g / l
Tank temperature: room temperature
Neutralizing time: 2 ~ 5min
7.2 Operating requirements:
7.2.1. When neutralizing, the materials should be moved up and down and anti-tilt, fully
neutralizing exhaust liquor in the hole and remove appearing dust.
7.2.2 Post- neutralizing materials must be washed by Level 2 overflow, and turn to the anodizing
tank.
7.2.3 The surface quality inspection should be strengthened to check the surface of the sand
surface conditions, mottling, burrs, welding lines and other surface defects, for timely processing,
reworking.
7.2.4 Regularly check screws are loose or not, to ensure good electrical conductivity.
8. Anodic oxidation:
8.1 process parameters:
Tank composition: H2SO4:150 ~ 180 g/l AL ion: 5 to 15 g/l
Tank temperature: 20 ± 1 º C
Oxidation voltage: 14 and 18 V
Current density: 130 ~ 150 A / ㎡
The oxidized time: according to requirements film thickness calculation.
8.2 Operating requirements:
8.2.1 Anodic oxidation must be open before:
(a) Rectifier cooling water.
(b) Bath circulation cooling system (cooling unit).
(c) Send the exhaust fan.
8.2.2 Anodic oxidation must be checked in advance: conductive copper conducting copper
aluminum piece, hanging fixture and conductive beam in contact, and the situation of the
conductive, should be often burnished.
8.2.3 Anodic oxidation must be opened before a conductive copper cooling water, check and
conductive beam bending, whether the conductive bending beam must be replaced, in case of burn
out the conductive and impacts anodic oxidation.
8.2.4 Before electricity oxidation, profile must be placed in middle of oxidation tank, ensure that
with both side distances are the same.
8.2.5 Before electricity oxidation link up, driving hook must be taken off conductive beam hook,
when the power and oxidation end, driving hook can hang conductive beam hook, in order to
avoid short circuit, damage the equipment.
8.2.6 Anodic oxidation set the current density, oxidation method should accord to the oxidation
area of profiles multiplied with the current density. Shading materials for the current density of
oxidation must be controlled in 130 A / ㎡.
8.2.7 When Anodic oxidation, should often visited the voltage, current, temperature, etc. Various
kinds of instrument, any abnormal should be promptly eliminated.
8.2.8 After Oxidation of profiles, should detect the film thickness, and make records, if film
thickness can not reach the requirements, must be to prolong the oxidized time to film thickness to
meet requirements.
9, Electrolytic coloring:
9.1 process parameters:
Bronze is golden brown department
Bath composition: SnSO4: seven to 10 g/l GD: 35 to 45 g/l
NiSO4 • 6 H2O: 20 ~ 30 g/l SeO2:8 ~ 10 g/l
Additives: Same amount with SnSO4 CuSO4:2 ~ 3.5 g/l
H2SO4:15 ~ 20 g/l 12 to 17 g/l
PH: 0.6 ~ 1.0 PH: 0.7 ~ 1.025 ℃
temperature: 15 ~ 20 ~ 25 ℃
Voltage: 14 to 18 V 14 to 16 V
Shading time: 20 S ~ 15 min 2 ~ 6 min
9.2 Operating requirements:
9.2.1 Maintain bigger slope when putting anodic oxidated profiles into color cell, and placed at the
middle of poles, ensure equal polar distances.
9.2.2 When shading, driving hook must be taken off conductive beam hook, and rest for 0.5 ~ 1
minutes to color.
9.2.3 Shading voltage for the same kinds of color must be equal.
9.2.4 When bronze cell shading over, must be lifted immediately as soon as possible, flow bath,
transfer to sink quickly, fully clean the acid water in the hole of profiles, use coloring board to
compare, when color is too light, put it into coloring tank to electricity complementary color,
when color is too deep, put it into coloring tank (no electricity) or acidic water behind of oxidation
tank to fade (bronze series).
9.2.5 Because golden not fade, and shading time should not be too long.
9.2.6 The shaded profiles shall be washed adequately by level 2 water, then go on electrophoresis
or hole sealing.
10, Sealing:
10.1 Process parameters:
Bath composition: Ni ion: 0.8 ~ 1.2 g/l, F ion: 0.35 ~ 0.6 g/l, PH: 5.6 ~ 6.5, pure dampening
solution temperature: 20 ~ 30 ℃
Hole sealing time: oxidation film thickness (um) x 1.2 min around (subject to quality standards).
10.2 Operating requirements:
10.2.1 Profiles should be washed by pure water before sealing, in case the pollution of
electrophoresis and sealing slots.
10.2.2 When profiles enter into sealing slots, should prevent hole sealing water from splashing
into electrophoresis recycling tank.
10.2.3 Hole sealed profile after must be dried after being washed.
10.2.4 Sealed profile should be strictly prohibited to contact with oil, electrolyte and bare hands.
10.2.5 After sealing, should sport check the hole sealing quality, timely adjust hole sealing time,
ensure that hole sealing quality to achieve the requirements, and prevent the over-sealing powder.
11, electrophoresis
11.1 process parameters:
Tank composition:
Solids: 5 ~ 8%
Solvent: 1 ~ 5%
Conductivity: 550 ~ 900μS/cm
PH: 7.6 ~ 8.0
Electrophoresis Voltage: 90 ~ 120V
Temperature: 23 ± 3 ℃
Electrophoresis time: 1 ~ 2min
11.2 operating requirements:
11.2.1 Before electrophoresis, the ones must be gone through one pure water, two hot water, three
cold water washing, fully washing the acidic water and dirt in the material surface, hole and film
hole.
11.2.2 Always check PH, conductivity and cleanliness in the three water, keeping PH> 5.5 in the
water tank, the first pure water conductivity <120μS/cm, the second and the third water
conductivity <60μS / cm, and often change the water.
11.2.3 Temperature of hot pure water tank should be controlled between 60 ~ 80 ℃.
11.2.4 Articles in hot water tank's time between 3 ~ 5min, after the hot water wash, should be fully
dried and fully wiped to get conductive beam rid of oil and acid-base water. Keep special attention
on cleaning and cooling of thick-walled tubular.
11.2.5 Temperature of Cold pure water washing tank should be maintained below 30 ℃. Articles
that are washed in cold water should not be dried, preventing extra wave when electrophoresis.
11.2.6 Maintain the largest tilt when profiles are in the electrophoresis tank to facilitate the
exclusion of air.
11.2.7 After put into the electrophoresis tank, articles should be placed in the central electrode, and
ensure equal distance on both sides of the plate, and stand for one minute before electrophoresis.
11.2.8 When electrophoresis, circulating pump and electrophoresis recycling equipment must be
turned on. The two pure water tanks should meet the following technical requirements:
The first pure water, the second one
Solids: <1.0% <0.3%
PH: 8.0 ~ 8.3 8.0 ~ 8.5
Conductivity: <100μS/cm <50μS/cm
11.2.9 Electrophoresis solution should open refined purification system at fixed period as for the
increase of PH and conductivity to ensure the electrophoresis bath meet process requirements.
11.2.10 After electrophoresis, articles must be passed by two pure water.
11.2.11 Post-electrophoresis articles should be placed in the pre-dried area.
11.2.12 keep electrophoresis area clean, non-oil, no dust, no acid mist to pollute profiles and
electrophoresis tank.
12, Curing:
12.1 process parameters:
Curing temperature: 180 ~ 200 ℃ Curing time: 30 ~ 45min
12.2 operating requirements:
12.2.1 Before curing, check oven and curing temperature measurement system, and regularly
clean the curing oven.
12.2.2 When finished curing and cooled to room temperature, workers check the quality of the
electrophoresis film.
13, unloading, packaging
13.1 Preparation for discharge
13.1.1 Check the storage rack, transport trolley, film machine, packaging machine
13.1.2 Check the model, length, count, color on the card are consistent with the material object or
not. Make packaging requirements clear; prepare protective film, tape, wrapping paper and other
packaging materials.
13.1.3 Test oxidation thickness, composite thickness, sealing quality, the film hardness, film
adhesion, color, color variation, appearance quality. All of them adhere to requirements, then they
can be discharged, and fill oxidation product inspection records.
13.2 unloading, packaging
13.2.1 Water sealing material is not allowed to unload with water, electrophoresis materials must
be cooled to room temperature before unloading.
13.2.2 Profiles must be unloaded by teams, non-impacted, non-beat, and prohibited to be directly
contacted with the ground. They should be stacked neatly, and non-superelevation.
13.2.3 Wearing clean gloves to unload, handle, film, package. Well protecting the decorative
surface.
13.2.4 Strengthen the Self-check consciousness, together with the specialist inspection. The failure
profiles are bounded neatly into the designated locations, and notify the group to make them up.
Classifying the qualified profiles, and sending to the packaging area in batches.
13.2.5 Electrophoresis decorative surface materials should be labeled according to the provisions
of protection film bundled package count, then paper wrapped three packaging by order
requirements.
13.2.6 Between the decorative surfaces of sealing material, they must be protected by paper and
then wrapped.
13.2.7 The ones which are using EP paper packaging should be together with three-point paper
packaging.
13.2.8 WHEN packaging, articles must be classified by type, color, length and count. Use EP
paper to pack the leaving single sets.
13.2.9 Selection of packaging and packaging weight must be complied with the order
requirements.
13.2.10 Each packed bundle must be affixed with the certificate of checker number on the end
socket. Each certificate should be stated on the certificate type, length, count, color, lot number or
order number, and must be consistent with the physical materials.
Raw materials:
1, aluminum anodizing dyes (various colors)
2, degreasers CL-6
3, aluminum cleaner 161
4, polishing agent SR
5, sand surface agent EP-7
6, stain cleanser ES-220
7, removal silicon agent ES-120
8, inhibitor AL-200
9, Hard anode oxidation additives EC-N
10, Heat sealing salt SE-300
11, ammonium hydrogen fluoride (industrial grade)
12, sodium acetate, reagent grad
e